product
Home > Vessels For Sale > Trailing Suction Hopper Dredger > 7000m³ TSHD | BV

    7000m³ Trailing Suction Hopper Dredger | BV Classed

    BV-classed 7000m³ Trailing Suction Hopper Dredger with unrestricted navigation and Korean main engines, this cost-efficient mid-capacity vessel features a 7000m³ hopper, high-performance drag heads, and automated systems for efficiently handling sand, silt, and gravel. Ideal for channel maintenance, port expansion, and land reclamation, its durable hull ensures stable operation in diverse sea conditions, offering a reliable solution for global dredging contractors.
    Category:7000m³ TSHD | BV     Browse number:222     Release time:2026-01-23 09:15:22
  • Share:
  • Contact us Inquiry
  • WhatsApp:15952900547

Basic Vessel Information

  • Build Completion Date: September 17, 2012


  • Main Dimensions

  • Overall Length (LOA): 116.95m

  • Breadth: 22.00m

  • Moulded Depth: 8.90m

  • Maximum Summer Draft: 6.8m

  • Maximum Dredging Draft: 7.8m

Tonnage

  • Gross Registered Tonnage (GRT): 7,636

  • Net Tonnage (NT): 2,290

  • Deadweight Tonnage (DWT): 10,650

Propulsion & Power System

  • Main Engine: 2 × STX-MAN Diesel Engine, 3500KW (750rpm) each

  • Propeller: 2 × CPP (4-blade duct nozzle)

  • Generator: 3 × 425 KW + 1 × 120 KW (emergency)

  • Auxiliary Equipment: Central air conditioning, 375kw bow thruster

  • Anchor Winch: 2 × Hydraulic electric motor type (9m/sec)

Crane Configuration

  • Bow: 1 × 12T × 15m

  • Stern: 1 × 10T × 18m

  • Port side: 1 × 0.9T × 6m

  • Starboard side: 1 × 0.9T × 8m

Dredging System

  • Dredging Rake System: Dual rake, dual pump, dual operation

  • Rake Length: 34m (Effective dredging depth: 27m)

  • Dredging Pumps: 2 units

    • Pump Power: 1,685KW each

    • Pump Flow Rate: 12,000 m³/hr

    • Pump Caliber: 900 mm

  • High-pressure Flushing Equipment: 2 × 1,257 kw (3,240 m³/hr), Water jet pressure: 20 kg/cm²

  • Dredging Yield Meters: 2 units (at Dredge Pump outlet)

Tank Capacities

  • Fuel Oil Tank: 700 m³

  • Ballast Water Tank: 657.3 m³

  • Fresh Water Tank: 330 m³

  • Mud Hopper Capacity: 7,047 m³

Discharge Equipment (14 sets mud Hopper Doors)

  • Bottom Discharge: No.1 & 7 hoppers (two-stage opening: 100mm & 1,030mm); Other hoppers (full opening: 1,030mm)

  • Bow Blow: 2,000m (no shore booster pump)

  • Bow Rainbow: 50m

Vessel Speed

  • Maximum Speed: 13.0 kts

  • Dredging Speed: 1 ~ 3 kts

Fuel & Lubricant Consumption

  • Mooring Motor Fuel Consumption: 300 LT/day

  • Lubricating Oil Consumption: 10 LT/day

Crew Quota

  • Maximum Crew: 27 persons (23 Taiwanese, 4 foreign)

  • Minimum Safe Crew: 14 persons

Dredging Performance & Operation Limits

  • Effective Dredging Depth: 9 ~ 27m

  • Optimal Operating Conditions: Wind speed ≤13.8 m/sec (≤Beaufort 6), Sea wave ≤5, Swell ≤3, Wave height ≤2m; Inoperable during typhoon or severe wind/wave

  • Suitable Soil: Sand, clay, silt

  • Unsuitable Terrain: Crushed stone, cobblestone, rock with hardness N >70 (causes rake head damage)

  • Operating Area: Waterway or ≥50m offshore

  • Draft Restriction: Dredging area water depth ≥9m, Dumping area water depth ≥10m

  • Hopper Filling Time (Full Load): 1 hour

  • Supply Requirement: Fuel, fresh water and provisions need shore replenishment


image.png


Applications

Coastal port dredging, navigation channel deepening & maintenance

Large-scale sand extraction, land Reclamation and beach nourishment

Silt, clay and fine sand dredging works

Offshore & coastal engineering support projects

Harbor expansion & waterway improvement

Key Advantages

BV classed, Taiwan-built, excellent ship condition

Large hopper capacity: 7,047 m³

Strong working depth: 9–27 m

High-efficiency dual-pump & dual-drag system

Fast loading: full hopper in about 1 hour

Multiple discharge modes: bottom dumping, bow blowing, rainbow spraying

Stable MAN main engine & reliable CPP propulsion

Good speed: max 13.0 knots, suitable for A2 sea area

Well-maintained equipment, ready for operation




FAQs:  

❓Q:  What is delivery time?
     A: Around 2-3 months from MOA signed and Deposit paid.


❓ Q: What certifications?
     A:  BV class certificate , freely registered in all countries.  


  • Previous page: None
  • Next page: None

ONLINE MESSAGE

Please fill in a valid email address
Recommended Products

logo

Connect With Us
Other Useful Links

Copyright © Zhenjiang Yanyang Engineering Co., Ltd.  sitemap

This website uses cookies to ensure you get the best experience on our website.

Accept Reject